GALLERY

SPECS

Overview

  • Total Area: 3.41 acres

  • Total Building Size: 339,543 RSF

    • 5-story Building: 203,827 RSF

    • 4-story Building: 135,716 RSF

  • Usage Design: 60% Lab / 40% Office

  • LEED Gold (Platinum achievable)

  • Energy Source: 100% Electric

Highlights

  • Floor Heights:

    • Ground Floor: 20ft

    • Upper Floors: 16ft

  • Power Supply: 14,000A total

Structural

  • Seismic Risk Category: III

  • Live Load: 100 psf

  • Dead Load: 70 psf

  • Elevators:

    • 4 passenger elevators per building

    • 1 freight elevator per building

Proximity to Transport

  • 0.3 miles to San Carlos Caltrain

  • 2-minute walk to Laurel Street

Parking:

  • Parking Ratio: 2.2/1000 (secured underground)

  • EV Charging: 10% of stalls

  • Plumbed for Future EV: Additional 10%

Sustainability and Efficiency Features

  • Access to Quality Transit: Enhances connectivity and reduces reliance on cars.

  • EV Charging Stations: Provided for 10% of parking spaces, with infrastructure for an additional 10%.

  • Surrounding Density & Diverse Uses: WalkScore of 88, close to community services and amenities.

  • Bike Facilities: Supports alternative transportation methods.

  • Heat Island Reduction: Utilizes light-colored pavers and high-albedo materials on roofs to prevent heat absorption.

  • Water Efficient Landscaping: Uses native and adapted plants with efficient irrigation, reducing potable water use by at least 50%.

  • Water Use Reduction: Low-flow plumbing fixtures reduce water consumption by at least 35%.

  • Energy Efficiency: Targeting 5-12% energy savings with energy-efficient HVAC systems and other measures.

  • Ozone Depletion Prevention: HVAC equipment specified to have zero CFC-based refrigerants.

  • Indoor Air Quality: Ventilation system includes outdoor air flow monitoring and MERV 13 filters to ensure high-quality indoor air.

FLOOR PLANS

L1(Ground)

LOCATION

Transportation

NEIGHBORHOOD

CONTACT

Chase Lyman

clyman@sobrato.com

(650) 400-5700